CF-80Continuous FlowSeed TreaterInstallation and Operation Manual
10.0 GuidelinesGUIDELINES FOR HANDLING SEED-APPLIED PRODUCTS AND RECOMMENDED EQUIPMENTINSPECTION AND MAINTENANCE PROCEDURESThe following are general
Guidelines 11.0 General Equipment• Check lters daily at least once. Clean rinse off as necessary. The lter assemblies are intended to keep aggl
12.0 Warranty LIMITED WARRANTY, LIMITATION OF LIABILITY & CLAIMSBayer CropScience warrants that the Gustafson application equipment shipped he
This page intentionally left blank
Bayer CropScience4895 12th Avenue EastShakopee, Minnesota, 55379USA www.bayercropscienceus.com
This page intentionally left blank
TOC 3.0Table of ContentsGeneral Categories 4.0 - Installation, General Calibration & Seed CalibrationCalibration 5.0 -
4.0 General IntroductionGeneral CalibrationThe CF-80 seed treater can be easily calibrated. Determine the type of seed to be treated. Although th
Calibration 5.0 Calibration & Pump Priming1. Read the entire chemical label and MSDS to make sure you under stand the usage and rates to be ap
6.0 CalibrationCalibration & Pump PrimingIf more than the required volume of chemical is obtained, adjust the speed control knob to a lower sett
Maintenance 7.0 MaintenanceWhen you are nished treating seed, disconnect the discharge tubing from the elbow tting and place it into your original
8.0 Service Service Tips1. Make sure ball valve is in ON position.2. Check tightness of intake line tting - use pliers if necessary. Make sure th
Appendix
Kommentare zu diesen Handbüchern